The kitchen is the main project that we are working on. It is in need of a complete overhaul. We’ve scraped, spackled, primed, ripped out flooring, and debated paint colors.
Agnes has been “helping” too.
Right before the power-outage. We rearranged the kitchen. We moved the fridge out of it’s cubby hole, and moved the deep freezer in it’s place. The deep freezer fit perfectly, and it looks like I’ll be getting a pantry thanks to the swap. The fridge didn’t fare too well. It was acting up a bit, and not staying too cool. We cleaned it out when we moved it across the room, but it just didn’t cooperate with the change. It also started to make some terrible sounds, and refused to cool. I think it was just it’s time.
Luckily the old fridge gave up around labor day, and we did a lot of comparison shopping. James found an awesome deal, and I got a new fridge for the kitchen. I love it, and it is going to go perfectly with our kitchen redo.

